Ignore the mess. For the passed 2 weeks families been up from Tucson and the containers been used as guest house a kitchen, and storage for vast amounts of building supplies that slowly disappear into the structure then get replenished after frequent trips to home depot. Picture above is of the front wall.
All walls done with foam insulation
Electrical is all run except for the bathroom, which Ill build once I get the duct work in the attic done.
Light fixtures are all up
Started the insulation in the attic
All the progress has Ginger flat out tuckered!